
New TopShim run:

version = topshim 2.0.0
date = 2022-08-31
time = 19:21:54.812
command = topshim  ordmax=4 convcomp rga

FINE SHIMMING

Parameters:

probe = Z114854_0010
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 1.4 Hz
Iteration  2: FWHM Before= 1.4 Hz, Target= 0.3 Hz, After= 0.6 Hz
Iteration  3: FWHM Before= 0.6 Hz, Target= 0.4 Hz, After= 0.6 Hz
Iteration  4: FWHM Before= 0.6 Hz, Target= 0.4 Hz, After= 0.6 Hz
Iteration  5: FWHM Before= 0.6 Hz, Target= 0.5 Hz, After= 0.7 Hz
Iteration  6: FWHM Before= 0.7 Hz, Target= 0.5 Hz, After= 0.8 Hz
Iteration  7: FWHM Before= 0.8 Hz, Target= 0.3 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.498

shim changes: 
Z	-32
Z2	+35
Z3	-146
Z4	+863

duration = 2 min 7 sec
completed successfully
finished Wed Aug 31 19:24:00 2022


========================================================================
